Experience / PT HM Sampoerna

PT HM Sampoerna

Operations Intern · SKT Device Development Apprenticeship

DATES
15 April — 14 October 2026
LOCATION
Surabaya, Indonesia
MAIN PROJECT
Tooling documentation
ALSO
Two training-support assignments

I spent six months in Operations, working on three things. My main project was documenting the existing production tooling in CAD. Alongside it, I supported two training programmes: soft-skills training for group leaders and a technical training programme.

At my internship final presentation.
100+
TOOLING ITEMS MEASURED, MODELLED & DRAWN
100%
OF AGREED SCOPE COMPLETED
2
TRAINING PROGRAMMES SUPPORTED

MAIN PROJECT · TOOLING DOCUMENTATION

Documenting the tooling as it actually existed

The team needed accessible, consistent references for its existing production tooling. I inspected the physical tools, measured them, modelled them in Autodesk Inventor and produced dimensioned 2D drawings. The Process Engineers reviewed each one, I made their revisions, and the finished references went into Microsoft Lists as a shared reference across locations.

This was documentation of existing tooling rather than new tool design.

How each item moved through the process

Me Process Engineers Simplified, redrawn by me
  1. 01 · ME
    Inspect the tool
    Access via the tooling team
  2. 02 · ME
    Measure
    Calipers, rules, tapes, protractor
  3. 03 · ME
    Model in Inventor
    Parts, assemblies where needed
  4. 04 · ME
    Draw & dimension
    2D drawing + PDF reference
  5. 05 · ENGINEERS
    Review & approve
    Process Engineers check and request changes
  6. 06 · ME
    Revise & upload
    Reference shared on Microsoft Lists
IF THE TOOL WASN’T AVAILABLE I requested the vendor’s drawing package Process Engineer review Microsoft Lists

MY INITIATIVE

Setting up a tracker for the project

I set up an Excel tracker for the documentation project and used it to plan and manage my own work. It also became how I reported status to the Process Engineers: what was done, what was left, and what I needed from them to keep going.

WHAT IT TRACKED

  • 01Weekly completion and overall progress
  • 02Items completed
  • 03Items still needing work
  • 04Blockers and open issues
  • 05Information, drawings or decisions needed to proceed

The tracker also kept the coordination in one place. I set priorities, followed up on missing tools and vendor drawings, kept track of revisions, and handed over the finished set with a guide to where everything lives. The Process Engineers decided the scope and approved the drawings.

What was completed

Every item in the agreed scope was documented. I measured, modelled and drew most of them myself; where a tool wasn’t available, I obtained the vendor’s drawing package. The Process Engineers decided which items were in scope.

Training support

Two separate assignments · trainers delivered the content

Group-leader soft-skills training

Leadership · Communication · Industrial relations · Across multiple sites

MY ROLE

I handled training materials, equipment, participant activities, documentation and session logistics, while the designated trainers delivered the content.

Technical training programme

Devices · Maintenance · Related technical topics

MY ROLE

I assisted two senior trainers with slides, attendance, cameras, projectors and sound, documentation and basic troubleshooting.

What I took from six months

I came away more confident in how I communicate, take ownership and keep work moving when things aren’t fully defined.

01

Communication

Asking clear questions, confirming expectations and raising progress early, with engineers, vendors and training participants.

02

Ownership

Understanding the end goal, following up with vendors and engineers, and taking responsibility for finishing the project.

03

Changing requirements

Making steady progress while scope and responsibilities shifted across two workstreams, and keeping my own project organised throughout.

CERTIFICATE

Apprenticeship completed

PT HM Sampoerna’s certificate of completion for my SKT Device Development apprenticeship, 15 April – 14 October 2026.

Certificate of Completion · Apprenticeship Program “SKT Device Development” · Surabaya, 14 October 2026

Company drawings, item names, dimensions and internal records stay off this page. The diagrams are my own simplified versions.